The general situation is summed up in two ways. One is the two devices on the same horizontal line, which is at the same level. The two machines need to make silica foundation under the machine, the two machines placed placed in the foundation, from the ground distance. Then between two machines, build
construction waste crusher for concrete production silica crusher.construction waste crusher for concrete production silica crusher by jaw broken outlet has been connected to the feed down the machine, with a certain angle. To ensure that the material is uniform and reasonable access to the two construction waste crusher for concrete production silica crusher.
Another kind is itself has a certain gap, terrain, which belongs to the ladder type, then as a broken construction waste crusher for concrete production silica crusher machine can be installed in the high terrain, two crushing equipment placed on the step below, then the middle connecting small impact crusher connected by crushing machine discharge port connected to the feed two crushing machine export.Among them, the crushing machine to link key need crushing machine and the crushing machine is the indispensable equipment. Shanghai Machinery Co. Ltd. is a domestic equipment large crushing equipment manufacturer, a broken and two crushing all cannot do without crushing equipment, Shanghai mining machinery company with reasonable design, fine workmanship, by the broad masses of customers, is the user trust products.